32da9a4d
docs: record final native tiling trial acceptance
a73x 2026-09-05 13:14
Commit message
RETRO.md
| Old | New | ||
|---|---|---|---|
| @@ -282,10 +282,11 @@ Sprint 5 retrospective below and the delivery plan. | |||
| 282 | The user explicitly said “Let’s start sprint 5”, authorizing advancement. | 282 | The user explicitly said “Let’s start sprint 5”, authorizing advancement. |
| 283 | This supersedes waiting at that gate; separate Sprint 4 demo approval and | 283 | This supersedes waiting at that gate; separate Sprint 4 demo approval and |
| 284 | hands-on feedback are not claimed. Lifecycle remains in the final demo. | 284 | hands-on feedback are not claimed. Lifecycle remains in the final demo. |
| 285 | - [ ] Run the next ergonomic trial from proposed defaults through implementation | 285 | - [x] Run the next ergonomic trial from proposed defaults through implementation |
| 286 | and demo, apply any requested adjustments, and record whether feedback came | 286 | and demo, apply any requested adjustments, and record whether feedback came |
| 287 | from the recording or a hands-on trial, if available, separately from automation. | 287 | from the recording or a hands-on trial, if available, separately from automation. |
| 288 | Trial recordings are shared; acceptance and any requested adjustments remain open. | 288 | The user accepted the recorded trial on 2026-09-05; no changes were requested. |
| 289 | No hands-on trial is claimed. | ||
| 289 | - [x] Start with a bounded review/cleanup of the accumulated native workflow, then | 290 | - [x] Start with a bounded review/cleanup of the accumulated native workflow, then |
| 290 | retain a closing cleanup pass; avoid introducing tabs UI or terminal tiling changes. | 291 | retain a closing cleanup pass; avoid introducing tabs UI or terminal tiling changes. |
| 291 | - [x] Review delayed destructive actions across focus, picker, resize, drag, | 292 | - [x] Review delayed destructive actions across focus, picker, resize, drag, |
| @@ -294,7 +295,7 @@ Sprint 5 retrospective below and the delivery plan. | |||
| 294 | the disposition without weakening bounded reconnect or join-only restoration. | 295 | the disposition without weakening bounded reconnect or join-only restoration. |
| 295 | - [x] Run the complete multi-host workflow and final adversarial review, including | 296 | - [x] Run the complete multi-host workflow and final adversarial review, including |
| 296 | shared sessions, state ownership/failures, high DPI, and cleanup of owned fixtures. | 297 | shared sessions, state ownership/failures, high DPI, and cleanup of owned fixtures. |
| 297 | - [ ] Record final demo acceptance separately from automation and any hands-on | 298 | - [x] Record final demo acceptance separately from automation and any hands-on |
| 298 | ergonomic feedback, update the spec's completion status, and commit the milestone. | 299 | ergonomic feedback, update the spec's completion status, and commit the milestone. |
| 299 | - [x] Evaluate model economy for the sprint using available evidence: record the | 300 | - [x] Evaluate model economy for the sprint using available evidence: record the |
| 300 | bounded pair's task scope, review yield, and observed token/time cost, explicitly | 301 | bounded pair's task scope, review yield, and observed token/time cost, explicitly |
| @@ -339,8 +340,9 @@ release GUI with the Debug daemon failed the new latency assertion at 878 ms. | |||
| 339 | ## Native tiling — Sprint 5, 2026-09-05 | 340 | ## Native tiling — Sprint 5, 2026-09-05 |
| 340 | 341 | ||
| 341 | The user explicitly authorized the release review. Implementation, adversarial | 342 | The user explicitly authorized the release review. Implementation, adversarial |
| 342 | review, closing cleanup assessment and final gates are complete. Final demo | 343 | review, closing cleanup assessment and final gates are complete. The user accepted |
| 343 | acceptance remains pending; advancing from Sprint 4 is not recorded as a separate demo approval. | 344 | the final recorded trial on 2026-09-05 (“Trial passes! Good work”). Advancing |
| 345 | from Sprint 4 is not recorded as a separate demo approval. | ||
| 344 | The final trial retains the existing keys and asks for feedback on target clarity, | 346 | The final trial retains the existing keys and asks for feedback on target clarity, |
| 345 | Cancel-first confirmation, and returning to terminal input. Hands-on feedback is | 347 | Cancel-first confirmation, and returning to terminal input. Hands-on feedback is |
| 346 | optional and will be recorded separately from video approval. | 348 | optional and will be recorded separately from video approval. |
| @@ -391,7 +393,9 @@ The [private final demo](https://charizard.folk-amberjack.ts.net/sprint5/) conta | |||
| 391 | the 61.2-second lifecycle/raw-output trial and a 23.4-second mouse recording. Both | 393 | the 61.2-second lifecycle/raw-output trial and a 23.4-second mouse recording. Both |
| 392 | use the final release GUI on isolated Sway at 200%, with no audio. Test fixtures | 394 | use the final release GUI on isolated Sway at 200%, with no audio. Test fixtures |
| 393 | and compositors were stopped; only the explicitly shared demo service remains. | 395 | and compositors were stopped; only the explicitly shared demo service remains. |
| 394 | The implementation is ready for user acceptance; no approval is inferred. | 396 | The user accepted implementation `1d43cd59` through the recorded trial, with no |
| 397 | requested changes. Sprint 5 and the native tiling milestone are complete. | ||
| 398 | No hands-on trial or retroactive separate Sprint 4 approval is claimed. | ||
| 395 | 399 | ||
| 396 | ### Delegation and retained debt | 400 | ### Delegation and retained debt |
| 397 | 401 | ||
| @@ -414,8 +418,9 @@ this milestone. | |||
| 414 | 418 | ||
| 415 | ### Actions for the next authorized sprint | 419 | ### Actions for the next authorized sprint |
| 416 | 420 | ||
| 417 | - [ ] Record final Sprint 5 demo acceptance and any requested ergonomic adjustment; | 421 | - [x] Record final Sprint 5 demo acceptance and any requested ergonomic adjustment; |
| 418 | distinguish recorded approval from any hands-on trial. | 422 | distinguish recorded approval from any hands-on trial. Accepted on 2026-09-05 |
| 423 | with no requested changes; recorded-demo approval only. | ||
| 419 | - [ ] Start with available Luna/Terra slots and short briefs containing the pinned | 424 | - [ ] Start with available Luna/Terra slots and short briefs containing the pinned |
| 420 | compiler/cache command; record model selection, review yield and available cost | 425 | compiler/cache command; record model selection, review yield and available cost |
| 421 | evidence without estimating missing token totals. | 426 | evidence without estimating missing token totals. |
docs/superpowers/plans/2026-09-05-native-tiling.md
| Old | New | ||
|---|---|---|---|
| @@ -1,7 +1,8 @@ | |||
| 1 | # Native tiling — delegated delivery plan | 1 | # Native tiling — delegated delivery plan |
| 2 | 2 | ||
| 3 | Design authority: [native tiling spec](../specs/2026-09-05-native-tiling-design.md). | 3 | Design authority: [native tiling spec](../specs/2026-09-05-native-tiling-design.md). |
| 4 | Status: Sprint 5 implemented, reviewed, and validated; final demo acceptance pending. | 4 | Status: native tiling milestone complete. Sprint 5 implemented, reviewed, |
| 5 | validated, and accepted by the user on 2026-09-05. | ||
| 5 | Sprint 4 is implemented, reviewed, and validated; separate recorded-demo | 6 | Sprint 4 is implemented, reviewed, and validated; separate recorded-demo |
| 6 | acceptance was not given. Sprint 3 acceptance passed. | 7 | acceptance was not given. Sprint 3 acceptance passed. |
| 7 | 8 | ||
| @@ -637,7 +638,9 @@ The owned page/video server is `/tmp/muxg-sprint5-demo/server.py` on loopback | |||
| 637 | Earlier demo routes remain available. Scripts and assertions are retained under | 638 | Earlier demo routes remain available. Scripts and assertions are retained under |
| 638 | `/tmp/muxg-sprint5-demo/` and `/tmp/muxg-sprint5-mouse/`. | 639 | `/tmp/muxg-sprint5-demo/` and `/tmp/muxg-sprint5-mouse/`. |
| 639 | 640 | ||
| 640 | Reviewer approval and implementation are complete; user demo acceptance and any | 641 | Implementation `1d43cd59` and reviewer approval are complete. The user accepted |
| 641 | requested ergonomic adjustments remain pending. SSH EOF/authentication error | 642 | the final recorded trial on 2026-09-05: “Trial passes! Good work”. No ergonomic |
| 643 | adjustments were requested; hands-on use is not claimed. This closes Sprint 5 | ||
| 644 | and the native tiling milestone. SSH EOF/authentication error | ||
| 642 | classification is retained with the follow-up owner/trigger in RETRO.md. Tabs UI | 645 | classification is retained with the follow-up owner/trigger in RETRO.md. Tabs UI |
| 643 | and rearranging panes are outside the delivered milestone. | 646 | and rearranging panes are outside the delivered milestone. |
docs/superpowers/specs/2026-09-05-native-tiling-design.md
| Old | New | ||
|---|---|---|---|
| @@ -1,7 +1,8 @@ | |||
| 1 | # Native tiling — draft design and delivery plan | 1 | # Native tiling — design and delivery plan |
| 2 | 2 | ||
| 3 | 2026-09-05. Status: the native tiling milestone is implemented, reviewed, and | 3 | 2026-09-05. Status: the native tiling milestone is implemented, reviewed, and |
| 4 | validated through Sprint 5; final recorded-demo acceptance is pending. Separate | 4 | validated through Sprint 5; the user accepted the final recorded trial on |
| 5 | 2026-09-05 (“Trial passes! Good work”). No changes were requested. Separate | ||
| 5 | Sprint 4 demo approval was not given; the user explicitly authorized advancing | 6 | Sprint 4 demo approval was not given; the user explicitly authorized advancing |
| 6 | to Sprint 5. Sprint 3 was accepted after its mouse-focused recording. | 7 | to Sprint 5. Sprint 3 was accepted after its mouse-focused recording. |
| 7 | 8 | ||